Wednesday, December 13, 2017
01 March 2017

Dear Resident,

Greetings from Al Hamra Real Estate Development.

The unit rate for cooling consumption is 35 fils / kwh for the Golf Residents (Buildings B-H) due to the increased cost of electricity since 2015, when the unit rate was last revised. This is effective immediately.
There are no other changes in the tariff.

If you do not wish to receive the hard copies of the bills, kindly register on our website http://www.alhamrautilitybilling.com/ and opt for Green Bill.

Tariff

Tariff

Tariff Schedule from January, 2017

Building Electricity Water Chiller Gas
Sewage
Rate (Fils per kwh) Unit (IG) Rate (Fils) Demand Charge (AED per Refrigeration
Ton (RT) per year payable monthly)
Consumption Charge (Fils per kwh)  Rate
(AED per m3)

Bab Al Bahr 43 + Fuel Surcharge 0 - 6000 5.0 AED 600 35 Not Applicable
50% of water
charges but not
less than 20 AED
6001 - 12000 5.5
12001 - 600000 6.0
Golf
Bill Through FEWA 0 - 6000 5.0 AED 600 35  Not Applicable 
6001 - 12000 5.5
12001 and above 6.0
Royal Breeze Bill Through FEWA 0 - 6000 5.0 AED 600 35 Not Applicable 
6001 - 12000 5.5
12001 and above 6.0
Marina Bill Through FEWA 0 - 6000 5.0 AED 600 35  Not Applicable
6001 - 12000 5.5
12001 and above 6.0
Townhouses, Villas Bill Through FEWA 0 - 6000 5.0 Not applicable Not applicable Not Applicable
6001 - 12000 5.5
12001 and above 6.0
 Bayti Bill Through FEWA   0 - 6000  5.0 AED 600   35  11.50
6001 - 12000   5.5
 12001 and above  6.0

Account and Service Charges

Line Charge AED Applicable Notes
Electricity meter charges 5 Monthly
Water meter charges 5 Monthly
Cooling(BTU) meter charges 5 Monthly
Meter Verification 250 Upon request Should the meter be found faulty the amount will be refunded
Late Penalty - Amount outstanding
100 AED to 300 AED
301 AED to 1000 AED
1001 AED and above

50
75
100
Not cleared
by due date
Due date is 25 days from the statement date
Final Bill Charges 100 Upon request If the move-out date is less than 90 days from the move in date
 If request is made on short notice (urgent request)
Disconnection Fee 150 Each time 10 days after statement date if no payments have been made and the outstanding bill is more than 1000 AED
Reconnection Fee 150 Each time On clearing dues and reconnection is made
Cheque Bounce Fee 500 Each time Effective 1st December 2014
Illegal Reconnection/tampering with meters 3000 Each time Unauthorized reconnection of any utility
grup porno